H2 is the Future and it’s Here!

Woodbridge Energy Company “WEC” has the technology to change our thinking of the hydrogen market and deployment. Our advantage is that the science is straight forward and that equates to design, manufacturing, logistics, deployment, installation, finance, operation and maintenance will be also. Our process is such that we get the most out of the water that we gasify. Our exclusive water processing system allows us to process salt water, waste water with total solids being high and even frac water by removing all those components and more, then input it into the hydrogen generation system.

Hydrogen storage is a huge issue with other systems that need to store H2 in large quantities. The cost for such a system can run more than the electrolyzer system that produces the hydrogen. We have estimated that our storage is 1/100th the cost of the competition. The shipping of LNG and Hydrogen like the vessel in the video below is extremely expensive and increases the danger to the public. We can ship out hydrogen ready product in a standard truck tanker, new tanker trailer is about $60,000 USD and a H2 trailer about $450,000.


Leave a Reply